Our employees in the period of 2005 – 2015 have designed the following reference projects:
NITROGEN REMOVAL PLANT GRODZISK, POLAND
Client: PBG S.A., Poland
Project execution period: 2006 - 2010
Investment cost estimate: 90 mill EUR
Scope of works: Detailed engineering; As-built; Operation documents preparation; Compliance supervision; Approval procedure assistance
GLYCOL /TEG/ REGENERATION UNIT, FORTIES, NORWAY
Client: APACHE North Sea Ltd. /Kanfa Aragon
Project execution period: 2008
Parameters of basic design: Max. daily capacity of dried gas 25 MM SCFD for given gas composition
Target: Detailed design for 3 identical Glycol Regeneration Packages incl. 3D model preparation process design/P&IDs by Kanfa Aragon AS
Scope of works: 3D model preparation; General arrangement of the skid; Entire piping system incl. Isometrics; Structural steel; Calculation checks; Bill of materials; Reassembly procedure; Other supportive and coordination works
GLYCOL /TEG/ REGENERATION UNIT, OLOWI, NORWAY
Client: CNR International Ltd. Canada
Capacity: 90,000 cum/hr dried gas 3,800 kg/hr TEG
Target: inštalácia jednotky ako súčasť; technológie ťažby/ prepravy/ distribúcie FPSO /Floating Production Storage; and Off-Loading/
Scope of works: Detailed engineering package; 3D model preparation; Unit isometrics
VHP GAS PIPELINE DN 500 PN 8.4MPa Skoczów – Komorowice - Oświecim –Tworzen: Phase III – 53 km
Client: GAZ SYSTEM S.A., POLAND
Project execution period: 2019 - on going
Scope of works: Project for Zoning Permint,
Basic Design,
Detailed Design,
Assistance on construction and commissioning phase