1.stage 1.2 billion Nm3 2.stage 3.5 billion Nm3
Reference projects
Our employees in the period of 2005 – 2015 have designed the following reference projects:
INSTALLATION OF TWO TANDEM GAS COMPRESSOR UNITS, 2x30MW, COMPRESSOR STATION KS 03 VEĽKÉ ZLIEVCE, SLOVAKIA
Client: eustream, a. s., Slovakia
GCU Supplier: Rolls-Royce Energy Systems, Inc., Ohio, USA
Project execution period: 2009 - 2013
Scope of works: Installation of two GCU with 2 Compressors in tandem, ~30MW each including all necessary utilities and auxiliary systems in CS03 on existing transit pipeline system of Slovakia
COMPRESSION RATIO INCREASE AT COMPRESSOR STATION KS 01 VEĽKÉ KAPUŠANY ON TRANSIT GAS PIPELINE, SLOVAKIA
Client: SPP a.s., Slovakia
Project execution period: 2007 - 2010
Investment cost estimate: 100 mill EUR
Target: performing engineering services on pre-construction, construction, commissioning phases for the purpose of increasing gas compression ratio from 1.4 to 1.5 by installing two 30 MW turbosets
Scope of works: General Management of the Project; Basic engineering phase; Detailed engineering phase; Assistance on construction and commissioning phase
LMG PROJECT - OIL, GAS, C5 +, LPG, LIQUID SULPHUR PRODUCTION, Poland /Central Facility, Near-Wellbore Zones, Pipelines/, POLAND
Client: PGNiG S.A. Poland
Project execution period: 2008 – 2013
Investment cost estimate: 1 397 000 000 PLN
Capacity: 1,300 tonnes crude oil/day 15 000 m3 gas/hr
Target: 40 tonnes of liquid sulphur day LPG 27 tonnes of LPG/ day C5+ 13 tonnes/day.
Developing a total of 14 wells: 7 at Lubiatow oil & gas deposits, 3 wells as Miedzychod and 4 wells at Grotow. Construction of near-well installations, gathering pipelines connecting the wells to LMG Central Facility (CF), construction of the Central Facility, oil & gas products pipelines connecting the CF to the supply terminal. The targeted production in 2013 – 0.9 mill tonnes/yr.
Scope of works: Basic & detailed design; Supply & construction & installation; Project management; Technical supervision; Commissioning, start-up; Test operation
UNDERGROUND GAS STORAGE (PMG) Wierzchowice, POLAND
Client: PGNiG – Polskie Gornictwo Naftowe i Gazownictwo SA, Poland
Project execution period: 2009 – 2014
Investment cost estimate: 332 million EUR
Scope of works: Installing & construction of the technology for the injection and withdrawal of gas from UGS at Wierzchowice near Wroclaw. The field originally had 11.9 bill. m3 of gas, 7.8 bill. m3 of gas produced 1972 to 1995, while 4.1 billion m3 remained in the field. Gradually stopped production and in 1995 decided to be rebuilt & utilized as underground gas storage.
underground gas storing capacity extension Gajary-Báden, SLOVAKIA
Client: NAFTA a.s., Slovakia
Project execution period: 2007 - 2014
Investment cost estimate: 93 mil EUR
Capacity: Storage capacity 500 – 550 mil. SmM3; Max. daily production output 6 mil. Sm3/day; Possible Extension of daily capacity 12 mil. Sm3/day; Max. daily injection output 5 mil. Sm3/day; Pressure range in connection point to transit gas pipeline 4,3 – 6,5 MPaa; Pressure range in the Central Area 3,0 – 21,0 MPaa